Sirhowy Enterprise Way

South Wales

Project Value - £35.9m

Project Sector - Roads

UK

About The Project

The 30-year Sirhowy Enterprise Way concession covers the design, build, finance and operation of improvements to the A4048/A472 strategic highway network between the north of Blackwood and the east of Pontllanfraith. The scheme consists of a new single 3.4 km carriageway and two key cross valley links (total road length 4.3 km).

The road was opened to traffic in December 2005 and forms a gateway to Oakdale Business Park which was constructed to help regenerate the areas of Blackwood, Oakdale and the surrounding communities.

Similar Projects

Golden Ears Bridge

C$1500m

Canada

The Golden Ears Bridge is a six-lane extra dosed bridge in Metro Vancouver, British Columbia. It spans the Fraser River, connecting Langley on the south side with Pitt Meadows and Maple Ridge on the north side.

More Information
Golden Ears Bridge

A55 Llandegai to Holyhead

£102m

UK

The concession includes operation and maintenance of the route from Bangor on the mainland to Holyhead on the Isle of Anglesey, which is a 40Km section of dual 2-Lane carriageway, part of which crosses the Menai Straits along the Britannia Bridge.

More Information
A55 Llandegai to Holyhead

A130 Bypass Essex

£76m

UK

The A130 was the first local authority road to be built using PFI, with new investment totaling £100 million. Built in two sections, the project consists of 14km of dual 2-lane carriageway, a grade separated interchange and 19 structures.

More Information
A130 Bypass Essex