Tees Renewable Energy Plant

Teeside

Project Value - £650m

Project Sector - Renewable Energy

UK

About The Project

MGT Power proposed the project in 2007 and established MGT Teesside in 2008 to oversee the project development. The subsidiary is collaborating with Korea South-East Power (KOSEP), KDB Daewoo Securities and Eco-Frontier to implement the project.

 

Similar Projects

Wear Point

£14m

UK

Wear Point Wind Farm is an onshore project located on disused industrial land at the SEMLogistics oil storage facility along the Milford Haven Waterway, just outside the village of Waterston.

More Information
Wear Point

Cramlington

£138m

UK

The Cramlington Renewable Energy Project involves the design, build, finance and operation of a combined heat and Power plant (CHP).

More Information
Cramlington

New Albion

£19m

UK

The project comprises seven wind turbines and the wind turbine technology, hubs, blades and a full 15-year service package will be provided by Senvion SE. Each MM82 wind turbine will have an installed generating capacity of 2.05MW. The overall height of the t

More Information
New Albion