M40 London to Warwick

Central

Project Value - £80m

Project Sector - Roads

UK

About The Project

The contract period for the widening works was 30 months. The Project Road is 123Km long with over 300 structures, which include bridges, culverts and retaining walls.

Similar Projects

Golden Ears Bridge

C$1500m

Canada

The Golden Ears Bridge is a six-lane extra dosed bridge in Metro Vancouver, British Columbia. It spans the Fraser River, connecting Langley on the south side with Pitt Meadows and Maple Ridge on the north side.

More Information
Golden Ears Bridge

A130 Bypass Essex

£76m

UK

The A130 was the first local authority road to be built using PFI, with new investment totaling £100 million. Built in two sections, the project consists of 14km of dual 2-lane carriageway, a grade separated interchange and 19 structures.

More Information
A130 Bypass Essex

Sirhowy Enterprise Way

£35.9m

UK

The 30-year Sirhowy Enterprise Way concession covers the design, build, finance and operation of improvements to the A4048/A472 strategic highway network between the north of Blackwood and the east of Pontllanfraith.

More Information
Sirhowy Enterprise Way